Impervious, Plugging and Waterproof Demonstration Project in Chenjiayan
Tunnel on Guangyuan section of Baocheng Line Down of Chengdu Railway Bureau


1 Introductions
2 Analysis Anysis of reasons for leakages
3 Solutions
4 Applications

4.1Waterproofing materials
4.2Equipment and machines
4.3Process of applications

5 Application organization, application progress and security measures
6 Several suggestions
7 Conclusions
8 Participants

 


 

Impervious, Plugging and Waterproof Demonstration Project in Chenjiayan
Tunnel on Guangyuan section of Baocheng Line Down of Chengdu Railway Bureau


1 Introductions
  The total length of Chenjiayan Tunnel on Guangyuan Section of Baocheng Line Down of Chengdu Railway Bureau is 1,924m. It was built in 1996. In recently years, the leakage and penetration of water in this tunnel is very serious. Especially in rainy season, there is many water jet and water gushing phenomenon on the vault place. It is really worth mentioning that there were jet flows on the vault because of the torrential rain on 18th, July 2005. This caused line outage of electric power contact network. This had resulted in great economic losses of road bureau.

ZHONGHE

Address: No.168,Jintang Rood,Hedong District,Tianjin,China

Communication address: P.O.B No.〔7〕77,Tianjin,China

TEL:86-22-84801243

E-mail:zhonghe2000b@163.com

Copyright © 2012 - 2016 ZHONGHE Waterproof Material Co., Ltd All rights reserved.